Lake Norman Marina Asphalt Sealcoating & Striping Project in Sherrills Ford, NC
3RD PROJECT COMPLETED FOR LAKE NORMAN MARINA
This marks our third time serving Lake Norman Marina in Sherrills Ford, NC, continuing a strong partnership built on reliability, quality, and proven results.
Completed in a single day, this project was executed with minimal disruption to daily operations, allowing the marina to remain fully functional throughout the process. Our crew delivered a detailed multi-phase asphalt maintenance plan, combining precision, efficiency, and craftsmanship at every stage. From surface preparation to final striping, every step was completed with a focus on long-term durability and a clean, professional finish.
Projects like this don’t happen by chance. They are the result of a team that shows up ready to perform and a client that trusts the process.
Start to Finish
This project was completed through a structured, step-by-step process to ensure long-lasting results and a clean, professional finish across the entire property.
STEP 1: Surface Preparation
STEP 2: Crack Sealing
STEP 3: First Coat Application
The first coat of commercial-grade, eco-friendly sealer was applied evenly across the surface. This base layer begins the protection process and enhances the overall appearance of the pavement.
STEP 4: Second Coat Application
A second coat was applied to ensure maximum durability, consistent coverage, and long-term resistance to traffic wear, weather conditions, and oil damage.
STEP5: Striping & Final Details
Once the sealcoat was properly cured, our crew completed precise line striping using traffic-grade paint. This included parking stalls, ADA-compliant handicap markings, directional arrows, and safety markings, bringing the project to a clean, professional finish.
Services Completed

We applied two coats of premium, eco-friendly sealant after thoroughly cleaning and preparing the surface. This protects the asphalt from wear, weather, and chemical damage while restoring a rich black finish.

Over 3,000 linear feet of cracks were sealed using hot rubberized material to prevent water intrusion and further deterioration.

All parking lot markings were restriped using high-quality traffic paint, including stalls, ADA spaces, arrows, and safety markings for improved flow and visibility.

Outdated markings were removed using a grinding method to create a clean surface for new striping and a more professional final look.
Results That Last
This project delivered more than just a visual upgrade; it significantly improved the performance and longevity of the pavement.
With proper sealing, crack repair, and professional striping, the property now benefits from:
- Increased durability and lifespan
- Improved safety and traffic flow
- Clean, professional appearance
- Protection against future damage
REQUEST A QUOTE
Please complete the form below for a free no-obligation quote for your project.