Proline Parking Lot Maintenance

Lake Norman Marina Asphalt Sealcoating & Striping Project in Sherrills Ford, NC

A fully executed step-by-step commercial asphalt maintenance system by Proline Parking Lot Maintenance.

3RD PROJECT COMPLETED FOR LAKE NORMAN MARINA

This marks our third time serving Lake Norman Marina in Sherrills Ford, NC, continuing a strong partnership built on reliability, quality, and proven results.

Completed in a single day, this project was executed with minimal disruption to daily operations, allowing the marina to remain fully functional throughout the process. Our crew delivered a detailed multi-phase asphalt maintenance plan, combining precision, efficiency, and craftsmanship at every stage. From surface preparation to final striping, every step was completed with a focus on long-term durability and a clean, professional finish.

Projects like this don’t happen by chance. They are the result of a team that shows up ready to perform and a client that trusts the process.

Start to Finish

This project was completed through a structured, step-by-step process to ensure long-lasting results and a clean, professional finish across the entire property.

STEP 1: Surface Preparation

Every successful asphalt project starts with proper preparation. Our team thoroughly cleaned the surface using power blowers and equipment to remove debris, dirt, and loose material. Edge cut-in work was also completed to ensure clean, defined boundaries before application.

STEP 2: Crack Sealing

Before sealcoating, all major cracks were treated using hot-applied rubber sealant. This critical step helps prevent water intrusion and stops further pavement deterioration, extending the life of the asphalt.

STEP 3: First Coat Application

The first coat of commercial-grade, eco-friendly sealer was applied evenly across the surface. This base layer begins the protection process and enhances the overall appearance of the pavement.

STEP 4: Second Coat Application

A second coat was applied to ensure maximum durability, consistent coverage, and long-term resistance to traffic wear, weather conditions, and oil damage.

STEP5: Striping & Final Details

Once the sealcoat was properly cured, our crew completed precise line striping using traffic-grade paint. This included parking stalls, ADA-compliant handicap markings, directional arrows, and safety markings, bringing the project to a clean, professional finish.

This phased approach ensures every project we complete meets the highest standards of durability, safety, and visual appeal.

Services Completed

Sealcoating

We applied two coats of premium, eco-friendly sealant after thoroughly cleaning and preparing the surface. This protects the asphalt from wear, weather, and chemical damage while restoring a rich black finish.

sealcoating

Over 3,000 linear feet of cracks were sealed using hot rubberized material to prevent water intrusion and further deterioration.

All parking lot markings were restriped using high-quality traffic paint, including stalls, ADA spaces, arrows, and safety markings for improved flow and visibility.

detailed quality control

Outdated markings were removed using a grinding method to create a clean surface for new striping and a more professional final look.

Results That Last

This project delivered more than just a visual upgrade; it significantly improved the performance and longevity of the pavement.

With proper sealing, crack repair, and professional striping, the property now benefits from:

  • Increased durability and lifespan
  • Improved safety and traffic flow
  • Clean, professional appearance
  • Protection against future damage

REQUEST A QUOTE​

Please complete the form below for a free no-obligation quote for your project.